Citra Wahana Sekar Buana

Product

MSVT 20

Specification

LEAFLET ENGLISH

Description

For the testing of multiple single-phase meters with fixed links between the voltage and current path on a test bench galvanic isolation must be provided at each test position. This can be done with isolation transformers for the voltage path or the current path at each position.

Related Products